Woolwich Central

Client

Meyer Homes

Architect

Formation Architects

Location

Woolwich, London

Completion Date

2022

Walsh has previously worked as structural engineers on the Phase 1 and 2 areas of the Woolwich Central development project, located off Grand Depot Road, and worked to provide a ground investigation for Meyer Homes on the Phase 3 and 4 areas.

Phase 3 will comprise the construction of a 14-storey (plus roof level) residential building. Phase 4 will comprise the construction of three new residential buildings between 13 and 15 storeys (plus roof level) high, split into eight blocks.

Walsh’s in-house Geotechnical team provided an initial desk study of available information and a detailed site investigation scope including boreholes, window samples, trial pitting, groundwater and gas monitoring. Walsh acted as investigation supervisor for the Phase 2 site investigation, engaging site investigation contractors working on the project and visiting site to confirm compliance to the scope of works.

These findings were then used to establish a detailed ground model, informing contamination, waste and geotechnical recommendations for each phase.

Woolwich Central
Woolwich Central

Committed To Sustainability


Sustainability is in our DNA and we have our own ambitious goals to achieve Net Zero as a business and with our designs. With innovative in-house monitoring tools, Walsh clients have seen on average reductions of 10-20% total embodied carbon, with some of our flagship work achieving 60-70% reductions compared with baseline figures.